| |
Test equipment is used to create stimulus signals and capture responses from the Devices under Test (DUTs). The test equipment can detect faults in the DUT and can be repaired as well. If testing the last phase of the development cycle is carried out consecutively it improves the performance and productivity, on the same it is a time and economy saver too. |
|